Avatar

Xebrio

  • Total activity 1210
  • Last activity
  • Member since
  • Following 0 users
  • Followed by 0 users
  • Votes 1
  • Subscriptions 655

Articles

Recent activity by Xebrio
  • Edit the due date of a test session

    Test session due dates can be edited until the test session is marked as final.    Navigate to the Test Coverage primary tab, and then to the Builds secondary tab. In the specific build's details w...

    • Edited
    • 1 follower
    • 0 comments
    • 0 votes
  • Test case ID

    A test case ID is generated by Xebrio in order of creation and is not editable. An example of a test case ID is TC-1.    Note that users will need view permissions in Test Coverage to view test cas...

    • Edited
    • 1 follower
    • 0 comments
    • 0 votes
  • Set the start and/or end date of a task

    If there are currently no dates set for the task, click the hyphen (-) below the Start Date and/or Due Date and select an appropriate date from the pop-up calendar. Alternatively, if there are date...

    • Edited
    • 1 follower
    • 0 comments
    • 0 votes
  • Editing custom task types and custom bug types

    A custom type may be edited in the system's Settings menu, located in the left main vertical panel. Navigate to the Types secondary menu and then to the appropriate Task or Bug tab.    To edit a ...

    • Edited
    • 1 follower
    • 0 comments
    • 0 votes
  • Delete a test session for a build

    Navigate to the Test Coverage primary tab, and then to the Builds secondary tab. In the details window of the specific build, click on the Test Sessions tab to show the list of test sessions for t...

    • Edited
    • 1 follower
    • 0 comments
    • 0 votes
  • Group actions from the tree view

    Group actions can be performed in the requirement tree view .    Users can right click on the item in the tree view and select Group Action. The requirements which will be included in the list of ...

    • Edited
    • 1 follower
    • 0 comments
    • 0 votes
  • Add/remove an assignee to a task

    The task assignee is located at the top right corner of the details window. Click on the current assignee (or if none yet then it will read Assignee) and choose the user to whom the task should be ...

    • Edited
    • 1 follower
    • 0 comments
    • 0 votes
  • Tags and creating custom tags

    Tags can be used to categorize or otherwise label bugs, tasks, and other elements within Xebrio. Custom tags are for creating a customized labeling mechanism specific to the project.   Existing tag...

    • Edited
    • 1 follower
    • 0 comments
    • 0 votes
  • Associate (add) contributors to a requirement

    In the requirement details window, click on the Add button and select Contributors from the drop down. In the pop-up, click on the project members name to select and click Add to finalize. If a use...

    • Edited
    • 1 follower
    • 0 comments
    • 0 votes
  • Mark a test session as Final

    Once all the test cases for a test session have a recorded result, the status of the test session will change to Testing Complete and there will be an option to mark the test session as final.   Na...

    • Edited
    • 1 follower
    • 0 comments
    • 0 votes